How a New Build Timeline Actually Works
- Site work and permits, with the rules for your county
- Foundation and framing, timed around the weather
- Dried-in stage: roof and outside walls sealed from rain and wind
- Rough-in for plumbing, wiring and HVAC
- Insulation, drywall and finish work through the final walkthrough
Weather & Honest Time Lines
Florida's rainy season can push back site work and outside work. Some contractors tell you an exact move-in date before permits are even pulled. They are usually making a promise they can't control. We give you an honest range up front. We keep you posted as each step wraps up. We don't give you one date that is likely to slip. There are inspections at each step: foundation, framing, rough-in and final. Each one is a set checkpoint in the time line. A failed inspection at any of them can add days or weeks. That is just why we build in extra time. We don't promise a razor-thin schedule.
"A contractor who runs the work directly is usually in a better spot. They don't hand you off between subcontractors. So they can catch problems early and stand behind the finished job."
Additions & Home Expansions
It might be a new home, a guest house or a big addition. Either way, we run the trades. We keep you posted at every step. We don't leave you to manage subcontractors yourself. Additions go through many of the same permit and inspection steps as a new build. They are just smaller. Tying new work into an old foundation and roofline takes more care than it seems. The new and old parts need to work together, not just sit side by side.
Frequently Asked Questions
Do you build custom homes from scratch?
Yes. We run new builds from permits through the final finish work. We can work from your plans or help line up the design.
How much will I be part of the work?
As much or as little as you like. We give you regular updates. We can also walk the site with you at key steps.
Do you handle additions as well as full new builds?
Yes. Big additions are a regular part of our new build work.
What makes new build time lines slip most often?
Permit delays and failed inspections are the two most common causes. We build extra time into our time line for both. We don't promise a schedule that is too tight.
Do you handle site work like clearing and grading?
Yes. Site work is part of the new build we run. We plan it along with the permits and the foundation. It is not a separate project.